Purpose |
SNC PO Feed Program update 90 days range |
Release No |
001 |
Submitted on |
03/17/2016 |
Submitted by |
Adithya |
Environment |
NECNED to NEQ |
Sent To |
Jingsha |
Object(s) created by |
Venkat |
Object(s) tested by |
Adithya |
Transport Status |
Created in NECNED300 / 100 |
Sl. |
Transport ID |
Description |
Object Name |
1 |
NEDK933586 |
SCM:24664:SNC PO Feed - Out of Range Exfact Date |
ZSNC_PO_EXTRACT |
Test ID |
Test Scenario |
Expected Results |
Actual Results |
P/F |
Documents |
Notes |
Tested By |
QA By |
PFEED1 |
Create few POs with the ex factory out of the 90 days offset |
The PO shall not be extracted in the PO Feed but shall be extracted when it achieves 90 days |
1. The PO created on 03/14/2016 with ex factory date 06/13/2016. The PO is not extracted on on 03/14/2016, It got extracted on date 03/15/2016 as it achieved 90 days window on 03/15/2016 2. PO is created on 03/17/2016, POs achieved 90 days window on 03/19/2016. and file is generated when PO feed is ran on 03/18/2016. |
P |
PO: 1. 4600010355 4600010358 2. 4600010398 4600010399 |
Adithya |
Adithya |
|
PFEED2 |
Change the ex factory date in the PO, pushing it to out of 90 days offset |
The PO shall not be extracted in the PO Feed but shall be extracted when it achieves 90 days |
Changed ex factory date in the PO to 06/13/2016 on 03/14/2016, the PO is extracted on 03/15/2016 when it achieved 90 days window |
P |
PO 4600010127 |
Adithya |
Adithya |
|
PFEED3 |
Have a PO with the ex fact date out of 90 days range and change in the PO1. Delivery address 2nd Time.2. Shipping Ins change. |
The PO shall not be extracted today but shall be extracted when it achieves the 90 days ex fact offset. |
PO created on 03/17/2016 and PO feed is ran, The PO is not extracted as it will achieve the 90 days window on date 03/18/2016 |
P |
4600010397 |
Adithya |
Adithya |
|
PFEED4 |
Have a PO with the Ex fact date out of 90 days and run the PO extract, then change Ex fact date in the PO so as it falls inside the 90 days offset. |
The PO shall not be extracted in the first PO Feed job but shall be extracted in the second job. |
PO created with ex fact date out of 90 days window. executed PO feed no file is generated for this PO. Changed the PO so as the ex factory date falls inside the 90 days ran the PO Feed, PO extract is generated. |
P |
4600010413 |
Adithya |
Adithya |
|
PFEED5 |
Create a PO with 4 lines out of which 2 lines shall fall inside 90 days window and other two lines shall not fall in 90 days window. |
The PO lines which has the ex fact days in 90 days shall be extracted, all the lines has to be extracted when the other two lines of the PO achieve the 90 days window. |
Create a PO with 3 lines one line with ex fact date 06/11/2016 another with 06/12/2016, another line with 06/13/2016, the lines which falls in 90 days window are extracted, once the line which has 06/13/2016 fallen inside 90 days all the lines of the PO are extracted. |
P |
4600010365 |
Adithya |
Adithya |
|
PFEED6 |
Create a PO with ex factory out of the 90 days window, Change the shipping instructions in the PO |
A file has to be generated for the older shipping instructions, when the po achieves the 90 day window PO feed shall be extracted for the new shipping instructions. |
PO created on 03/17/2016, changed shipping instructions from 60 to 58 A file with deletion indicator is generated on 03/17/2016 and When the program executed on 03/18/2016 as ex fact for the PO has achieved 90 days a file for the new shipping Instructions is generated. |
P |
PO 4600010396 |
Adithya |
Adithya |
|
PFEED7 |
Create a PO with ex factory out of the 90 days window, Change in the delivery address 1st time and 2nd time |
No file has to be generated on for the change, when the po achieves the 90 day window PO feed shall be extracted |
1. PO Created on 03/21/2016, changed Delivery address first time and executed the PO Feed No file has generated, changed the delivery address second time and executed the PO Feed No file has generated. Changed delivery address for PO 4600010422 on 03/21/2016, no file is generated on 03/21/2016, PO made in to 90 days window on 03/22/2016, when PO Feed is executed on 03/22/2016 the PO extracted in file. 2. PO Created on 03/22/2016 4600010434 with ex factory date on 06/21/2016, when PO Feed is executed on 03/22/2016 the PO is not extracted in the PO Feed file. PO achieves the 90 days window on 03/23/2016, when PO feed is executed on 03/23/2016 the PO shall be extracted. |
P |
PO: 1. 4600010422 2. 4600010434 |
Adithya |
Adithya |
|
PFEED6 |
Run the program as a Background Job: Having1. POs created with in the 90 days ex factory date. 2. POs created outside the 90 days ex factory date. 3. POs created with 4 lines of which 2 lines fall in 90 days window and 3 fall out side the window. 4. Change ex fact date in a PO moving out of 90 days. 5. PO having ex fact date out side 90 days window, change the shipping instruction. |
1. POs with ex fact date shall be extracted. 2. POs with ex fact outside 90 days shall not be extracted, how ever it shall be extracted when it achieves the 90 days. 3. 2 Lines of the PO shall get extracted and 2 lines shall not,All lines af the PO shall be extracted when the other two lines of the PO achieve the ex fact date 90 4. PO shall not be extracted in the PO Feed, how ever it shall be extracted when it achieves the 90 days. 5. PO shall not be extracted in the PO Feed, how ever it shall be extracted when it achieves the 90 days. |
1.Po feed File generated. 2.Po feed File not Generated. 3.line items 10&20 file generated.30&40 file not generated. 4.Po feed file not generated. 5.Po feed file not generated. |
Doc01: 1.4600010394 2.4600010395 Doc02: 1.4600010386 2.4600010387 Doc03: 1.4600010392 2.4600010393 Doc04: 1.4600010349 2.4600010355 Doc05: 1.4600010390 2.4600010391 |
Thiyagu |
Adithya |